Freeze-Dried Kiwi Slices (Actinidia chinensis) — Crisp Fruit Snack, 120g Jar
$6.47
89995 in stock
Description
Freeze-Dried Kiwi Slices (Actinidia chinensis) are crisp, tangy-sweet fruit slices made from ripe kiwi fruit, known in Traditional Chinese Medicine (TCM) as Mí Hóu Táo (猕猴桃). Long valued as a sour, sweet, and cooling food-herb, kiwi has traditionally been enjoyed for its thirst-quenching, fluid-generating character and its bright, refreshing flavor. Each 120g jar is produced by FD freeze-drying, preserving the fruit's natural color, aroma, and delicate crunch for an easy everyday snack.


Key Selling Points
- FD freeze-dried kiwi fruit slices
- Tangy-sweet, crisp fruit snack
- 120g resealable jar, simple packaging
- Made from kiwi fruit only
- Enjoyed year-round at work, dorm, or home


Quality & Sensory
Each slice keeps a pale jade-green to soft yellow-green color with a light, airy crunch. The aroma is fresh and fruity, recalling ripe kiwi, and the taste is bright and tangy with a gentle sweetness that lingers. Because the slices are freeze-dried rather than fried, they stay crisp and dissolve lightly on the tongue without greasiness.


Technical Specifications
| Product Type | Freeze-Dried Fruit Snack |
|---|---|
| Common Name | Kiwi Fruit Slices |
| Botanical Name | Actinidia chinensis |
| Net Weight | 120g per jar |
| Processing | FD Freeze-Dried |
| Storage | Refrigerate; shelf life 365 days |


Usage Scenarios
- Office desk snack
- Dormitory and study break treat
- Travel and commute snack
- Tea-time fruit accompaniment
- Light everyday sweet-tart nibble


Traditional Uses
In traditional Chinese food culture, kiwi fruit is enjoyed as a sour-sweet, cooling fruit that helps refresh the mouth and support fluid balance. Folk practice often serves it fresh or dried as a light snack, adds it to fruit teas, or pairs it with other mild fruits in daily refreshment. Freeze-dried slices carry this same easy, everyday character, making kiwi a convenient fruit to keep on hand for casual nibbling.


FAQ Q&A
Q: What is freeze-dried kiwi?
A: Freeze-dried kiwi is made by freezing fresh kiwi fruit and removing moisture under low temperature and vacuum. This keeps the fruit's color, aroma, and crisp texture while giving it a long shelf life.
Q: How should I store the jar?
A: Keep the jar refrigerated and tightly closed after opening. The stated shelf life is 365 days under the recommended storage conditions.
Q: How do I enjoy freeze-dried kiwi slices?
A: Eat them straight from the jar as a crisp snack, or add them to fruit teas, yogurt, or breakfast bowls for a tangy-sweet accent.

Additional information
| Weight | 0.43 kg |
|---|---|
| Dimensions | 12 × 12 × 15 cm |
Related products
-

Huang Qi Slices (Astragalus membranaceus) — Dried Nail-Grade Root Slices for Tea & Soup
$5.74 – $12.06Price range: $5.74 through $12.06 -

Chen Pi Shreds (Citrus reticulata) — Aged Dried Tangerine Peel, Unsulfured, 500g
$4.93 -

Mai Dong (Ophiopogon japonicus) Dried Root — Unsulfured Food Herb for Tea & Soup
$5.58 – $14.00Price range: $5.58 through $14.00 -

Dang Gui Slices (Angelica sinensis) — Gansu Minxian Dried Root Slices for Cooking & Tea
$4.44 – $20.49Price range: $4.44 through $20.49




Reviews
There are no reviews yet.